Work train in WB siding, WB freight holds the main at the "W" (wait) signal, and the pickup to be made waits in the EB siding. Brakeman on the ground (EB main) heads back to make the cut. |
Date:
4/15/1985 |
Location:
Truckee, CA Map ![Show Truckee on a rail map](/images/map_us.gif) |
Views:
344 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Bruce Flaws |
Locomotives: |
Author: Bruce Flaws
|
![WB action](http://s3.amazonaws.com/rrpa_photos/127424/img137.jpg) |
Picture Categories: Yard |
This picture is part of album: SP Truckee area pics from the 1980s |